Notice on Application for 2019 Open-end Research Fund of the State Key Laboratory for Geomechanics and Deep Underground Engineering

来源:办公室时间:2019-11-28点击数:

The State Key Laboratory for Geomechanics and Deep Underground Engineering (hereafter referred to as Laboratory) was established depending on two national key disciplines, i.e.,geotechnical engineeringandengineering mechanics in bothChina University of Mining and Technology (CUMT) and CUMT (Beijing),several provincial key disciplinesnamely disaster prevention &reduction engineering,protection engineering andgeological survey & information technology. In 2008, the Laboratory wasauthorized to start construction.Now, in order to promoteChina’s basic research and technological innovation ofgeomechanics anddeepundergroundengineering andgive full playtothe Laboratory’s function in international cooperation and high-level talentscultivation,the Laboratory has set uptheopen-end research fund to attractboth domestic and foreigntalents to work orconduct high-levelbasic researches,and make innovativeachievementby fully utilizing the resources ofthe Laboratory.

I.MajorResearchDirectionsof the Laboratoryand theResearch Fields

Supported by the Fund

1.MechanicalBehavior ofDeepRockMass&WallRockControlTheory

2.MechanicalBehavior ofDeepSoil& Interaction between theSoil and

UndergroundEngineeringStructure

3.Fundamental andAppliedResearches onArtificialFreezingTheory ofThickTopSoils

4.Deep Complex Geological Environment and Engineering Effects

5. RockDynamicMechanics and the Mechanical Stability of RockMassEngineering

6. DeepUndergroundResources Engineering (Geothermal Exploitation, Underground Energy Storage, Shale Gas Exploitation and Combustible Ice Exploitation)

7.DeepUndergroundSpaceDevelopment andUtilization Engineering

8.Fundamental Issues on Construction of Lunar Base and Exploitation of Planetary Mineral Resources

9. Applications Researchon New Techniques and New Materials in

GeotechnicalEngineering

II. Key support directions of this year

Fundamental research on deep space exploration, rock dynamic characteristics and disaster mechanism in deep complex environment, water inrush disaster mechanism and prevention and control technology of deep underground engineering, high-precision seismic exploration of deep underground engineering and accurate identification of disaster sources, in-situ geophysical testing methods and technologies of deep rock parameters, high-precision imaging methods of concealed geological bodies and design of monitoring system, etc.

III. Application for the Open-end Research Fund

1. The Laboratory invitesboth domestic and overseasscholars of therelatedfield to apply for projects focusing on the major research directions of the Laboratory and the research fields supported by the Fund. The Laboratory willselect the open-end fund projects in accordance with the principle of “fairness, impartiality,merit” and procedures of free application, preliminary examination by the Laboratory, andapproval by the Academic Committee.

2.TheLaboratoryplans to set upabout20 open-end fund projects in 2019.The average fund for each project amountstoRMB 80,000yuan at most.Generally, the research period willextend for two years. The project duration is fromJanuary 1, 2020 to December 31, 2021.

3. The Laboratory gives priority to the joint application of domestic and foreign scholars with researchers in the Laboratory and the continuation of funding projects for in-depth joint research with excellent completion. The laboratory gives priorities to the projects that work at the Laboratory, and gives priorities to the projects that use the public testing platforms of the Laboratory. If there is no existing cooperation with researchers in the Laboratory at the moment of application, the applicant should declare that the research project should be jointly carried out once approved and granted.

4.At first, the applicantshould read the Notice of Application and theManagementMethod for Open-end Research Fund.The email deadline is December 28, 2019. Oncethe application form has been approved,signed and stamped by the work unitof the applicant,the applicant should send it tothe Laboratoryin two copies (both original copy, printed on both sides inanA4paperand stapled to the left) before December 28, 2019.

5.BothXuzhou and Beijing have the Laboratory. Please send your application form to only ONE place.

6. If you have any questions, please contact the Laboratory, or refer to the homepage of the Laboratory:http://gdue.cumt.edu.cn;http://www.sklgdu.com.

7. Contact us:

(1)China University of Mining and Technology

Contacts: Wang Yansen、Gai Yanfei

Phone/Fax:86-516-83995678

E-Mail:sklyt@cumt.edu.cn

Address: The State Key Laboratory for Geomechanics and Deep Underground Engineering,Nanhu Campus of China University of Mining and Technology, Xuzhou, Jiangsu

Postcode: 221116

(2)China University of MiningandTechnology (Beijing)

Contacts: Liu Dongqiao、Hao Nai

Phone: 86-10-51733713

Fax: 86-10-51733557

E-mail: sklgdue_kfjj@163.com

Address: The State Key Laboratory for Geomechanics and Deep Underground Engineering,China University of Mining and Technology (Beijing), Ding No. 11, Xueyuan Road, Haidian District, Beijing

Postcode: 100083

Application Form for 2019 Open Fund Project of State Key Laboratory for Geomechanics & Deep Underground Engineering.doc

关闭